Front panel cable connections – IEI Integration EBC-3000 User Manual

Page 5

Advertising
background image



EBC-3000 IEI Technology Corp. Page 5

Figure 7: HDD Bracket (Top)

Step 2:

Attach the HDD to the HDD bracket. Align the
retention screw holes in the sides of the bracket
with the retention screw holes on the HDD. Insert
the retention screws into the bracket as seen below.

Figure 8: HDD Retention Screws

Step 3:

Attach SATA and power cable to HDD and SBC as
shown below according to the SBC user manual.

Figure 9: SATA Cables

Step 4:

Install the bracket with HDD into the chassis by
aligning the bracket retention screw holes in the top
of the HDD bracket with the retention screw holes
on the chassis. Insert the four previously removed
retention screws into the top of the HDD bracket
(Figure 10).

Figure 10: HDD/ODD Bracket Retention Screws

FRONT PANEL CABLE CONNECTIONS

The following buttons and LEDs are on the front panel of the EBC-3000
chassis.
„

1 x Power LED

„

1 x HDD LED

„

1 x Power switch

„

1 x Reset button

These components are all connected to the SBC with cables. To correctly
connect these cables, please refer to the technical documentation that
came with your SBC. The connectors that are provided with the chassis
are listed below.

No. Name

1

Power LED cable

1

Reset Switch cable

1

HDD LED cable

1

Power switch cable

Table 6: Chassis Connectors

Advertising