Figure 4-23: arm mounting retention screw holes – IEI Integration AFL2-W21-H61 User Manual

Page 77

Advertising
background image

AFL2-W21A/AB-H61

P a g e 58

NOTE:

When purchasing the arm please ensure that it is VESA compliant and that

the arm has a 100mm x 100mm interface pad. If the mounting arm is not

VESA compliant it cannot be used to support the AFL2-W21A/AB-H61 flat

bezel panel PC.

S te p 2:

Once the mounting arm has been firmly attached to the surface, lift the flat bezel

panel PC onto the interface pad of the mounting arm.

S te p 3:

Align the retention screw holes on the mounting arm interface with those in the

flat bezel panel PC (Figure 4-23).

Figure 4-23: Arm Mounting Retention Screw Holes

S te p 4:

Secure the flat bezel panel PC to the interface pad by inserting four retention

screws through the bottom of the mounting arm interface pad and into the flat

bezel panel PC.

Advertising