3.3 Installation and Configuration Steps
The following installation steps must be followed.
Step 1:
Unpack the UPS module
Step 2:
Install the battery packs
Step 3:
Mount UPS module to the AFOLUX panel PC
Step 4:
Connect the UPS module to the AFOLUX panel PC
3.4 Installing the Battery Packs
NOTE:
Before installing the battery packs into the AUPS-C20, it is
recommended to press the MCU reset button to return the AUPS-C20
to the factory default settings.
The AUPS-C20 could be installed up to four battery packs. To install the battery packs,
follow the steps below.
Step 1:
Remove the six top cover retention screws (Figure 3-1) and lift the top cover off
the AUPS-C20 module.
Figure 3-1: Top Cover Retention Screws