ODL Tubular Skylight User Manual

Page 22

Advertising
background image

22

23

Drill

Phillips Screwdriver

Gloves

Roofing Sealant

Hole Cutting Template

Formable Main Flashing

(9) 2” Screws

(9) 3/4 Washers

TOOLS & PARTS

Slide the UPPER portion of the main flashing under
the metal panel through the slit. Be sure to align the
flashing directly over the hole.

1

Be sure to dab sealant on all screw heads to ensure a
leak-free installation.

IMPORTANT

“Dry-fit form” the lower side of the flashing to
conform to the panel ridges.

2

Once flashing is formed over the panel ridges to your
satisfaction, apply a generous bead of sealant to the
underside of the LOWER flashing section.

3

Press formed flashing down around roofing material.

4

Attach with (9) 2” screws and 3/4 diameter washers
in an evenly spaced circular pattern around the 10” or
14” hole. The circular pattern should be 21” diameter
on the 10” unit and 24” diameter on the 14” unit.

Add additional 2” pan head screws as needed to
secure edge of flashing.

Refer back to Section 4c for complete installation.

5

5

1

2

3

4

Position & Secure Flashing

Section-12c

Metal Roofing Installation-
Using Formable Aluminum Flashing

Advertising