NOTE: Place two strips of quality greenhouse patching tape on the inside of

the outside layer where the air from the blower hits the film. This will
prevent rapid drying of the poly and will make it last longer.

3" x 2'-0" JUMPER TUBE

END FRAME
SECTION
(POLY FASTENER
NOT SHOWN)

ROOF

POLY

ROOF &
SIDE POLY

DOUBLE
POLY

JUMPER

TUBE

DAMPER

AIR

OUTLET

HOSE

CLAMP

ROOF POLY

(2) AIR
TRANSFER
GASKETS

(2) STOP TABS

INFLATION
MOUNT

ROOF POLY

INFLATION

BLOWER

END
WALL
POLY

FOAM GASKET

3" FLEX HOSE

GASKET

GASKET

INSIDE

LAYER

OUTSIDE
LAYER

PLAN VIEW

OF

GREENHOUSE

2

END POLY

END POLY

Install the inflation blower as the drawing indicates. (FIGURE 1) Location is optional, but, it must be located on a side wall. Next, install the jumper tubes approximately half way up the roof (FIGURE 2)
using the white foam gaskets provided. Four gaskets are required per jumper. One is to be located on the bottom of the inside layer. The other is located on the top of the inside layer. (FIGURE 2)
This can be accomplished by placing one gasket on the inside layer. Now cut the poly out of the gasket on the inside layer only. Use caution during this procedure. Do not cut the outside poly.

Next, insert another gasket (wax paper removed) through the center of the first gasket and stick it on top of the inside layer of poly. (FIGURE 3) You now have sandwiched the poly between the
gaskets and formed an air seal for the jumper.

Before you install the jumper, staple the gaskets together using an ordinary office stapler. Complete all jumpers and turn on inflation blower. The damper on this blower is commonly closed about half
way. Adjust damper to the desired poly tension, using an manometer as an inflation guide.

NOTE:
SEE KIT NUMBER PT2415 FOR PARTS IN THIS DRAWING.