Stage #2: Layout

A. Roof Plan Diagram

1. The first step is to use a roof plan and layout the bracket

location.

2. Place a mark on the floor 1’-0” from the outside corner

of the building and continue marking the rest of the wall

on 8’-0” centers at all eaves.

3. When you get to the end of the wall, place a mark

on the floor at 1 foot back from the end.

4. Continue around the house until all eave areas are

laid out and marked on the floor.

5. Distribute the proper material to each mark on the

floor.

a. One Stacker Bracket� with Top Clamp attached.

(Be sure to match clamp size with wall thickness)

b. One Guard Rail Post

c. One 36” Support Brace

d. Two 2x10x10’-0” scaffold planks

e. Three 2x4x10’-0” rails or approved metal rails.

f. End rails where necessary.

g. One optional lowering strap per sheer area.

Stage #3: Installation

1. Mark bracket location on 36” 2x4 making sure 2x4

crosses three studs, even at sheer areas.

2. Nail 2x4 to bracket at layout mark (NOTE! The

bracket is not always in the middle of the 36” 2x4) DO

NOT drive nail flush, as it must be removed later.

Page 5

Special Conditions

A. Balloon walls

O.S.H.A, requires interior fall protection at certain working heights.

Since trigger heights vary from state to state, be sure to check local

and state requirements. Below is an example of a variable height

scaffold for use at interior locations of balloon walls. If you build or

erect this first, it makes a good platform to work from while installing

the bracket system.

Important !

a. Notice both platforms

and their heights.

b. Sole plate allows for ease

of assembly/removal

c. Adequate bracing

d. Maximum 8’-0” spans

B. Openings At Bracket Locations

When a Stacker Bracket� falls in an opening such as a window or

doorway, you must install a double trimmer at that location, with three

16d nails at the top and bottom, along with the proper line brace.

C. Shear Walls

Where shear–walls occur, the optional strap should be looped through

the bracket with the free end laid over the wall for future use.

D. Moving Installed Brackets

If a bracket needs to be moved for the framer/stacker, simply loosen

the eye-bolt and move the bracket over a few inches. (Never loosen

the hex bolt until you are ready to remove the entire system.)

Page 10

WARNING

Never use #1 D. F. 2 x 4’s for spans greater than 8’-0”.

SAFETY NOTE

Do not create a hazard at the

bal- loon wall by having a

platform at a high window

without putting hand rails thru

such openings.

SAFETY NOTE

Prior to installation of the Stacker Bracket system, you must

use a barricade to define a perimeter around the building to

prevent injury from falling objects. Be sure to consult your

local and state regulations for specific requirements.