English – Pfister R89-50XK User Manual

Page 3

Advertising
background image

ENGLISH

ENGLISH

7 TRIM FLANGE ATTACHMENT

Position Flange (7A) on Valve (7B) with Drain Hole (7C) at the bottom. Place

Protective Washer (7D) on the short end of the reversible Retainer Sleeve (7E).

Screw Retainer Sleeve (7E) onto threaded section of the Stem and Bonnet (7G).

Tighten Retainer Sleeve (7E) by hand until Flange (7A) is snug to finished wall

surface. If the short end of the Retainer Sleeve (7E) is too short, reverse it to

use the longer end.

8 HANDLE ATTACHMENT

Screw Stem Extender (8A) onto the Valve Stem (8B). Thread the Set Screw (8C)

into the Handle (8D) and thread it in only three to four turns. Place Handle (8D)

onto the Stem Extender (8A) and tighten the Set Screw (8C) by using the Hex

Wrench (8E) that is provided.

Make sure Set Screw (8C) is securely tightened to handle (8D).

10 SPOUT INSTALLATION

A. For Copper Pipe Connections:

Connect Copper Tube (10A) into the elbow inside the wall and remove the sharp

edges all around the outer tube (10B). The Copper Tube (10A) is to project 3

1

/

4

” to 3

3

/

8

” from the finished wall. Press Tub Spout (10C) onto Pipe Nipple

(10A) until spout is properly positioned and flush to the finished wall surface.

Tighten Set Screw (10D) located at the bottom of spout.

B. For Threaded Iron Pipe Connections:

Apply PTFE plumbers tape on both ends of Pipe Nipple (10A) (not included).

Screw Pipe Nipple (10A) into the elbow inside the wall and tighten with pipe

wrench. The Pipe Nipple (10A) is to project 3

7

/

8

” to 4” from the finished wall.

Remove Internal Connector (10E) from Spout (10C). Screw Tub Spout (10C)

onto Pipe Nipple (10A) and tighten until Spout is properly positioned and flush

to the finished wall.

11 UNIT START UP

Turn on hot and cold water supplies, and check all connections for leaks.

9 SHOWER ARM INSTALLATION

Insert the end of Shower Arm (9A) through the Shower Flange (9B). Apply PTFE

plumber's tape to both ends of Shower Arm (9A) according to manufacturer's

instructions. Screw the end of Shower Arm (9A) into pipe elbow inside the wall.

Slide Shower Flange (9B) tight to the wall.

7

8

9

10

3

7A

8A

9A

7B

7C

7C

7D

7E

7G

8B

8C

8D

8E

9B

10A

3

7

/

8

” to 4”

10B

3

1

/

4

” to 3

3

/

8

10C

10D

A

B

10A

10E

10C

Advertising