Chapter 2. Installing and replacing a high speed switch module

9

•

Configuration requirements for the switch module and the BladeCenter unit might vary. You
can obtain up-to-date information about the switch module and the BladeCenter unit at

http://www.ibm.com/systems/bladecenter/

.

Installation guidelines

Before you install the switch module in the BladeCenter unit, read the following information:

•

Read the safety information that begins on page v,

“Handling static-sensitive devices”

on

page 10, and the safety statements in the BladeCenter unit documentation. This information
will help you work safely.

•

Observe good housekeeping in the area where you are working. Place removed covers and
other parts in a safe place.

•

Blue on a component indicates touch points, where you can grip the component to remove it
from or install it in the blade server or BladeCenter unit, open or close a latch, and so on.

•

Orange on a component or an orange label on or near a component on the switch module,
blade server, or BladeCenter unit indicates that the component can be hot-swapped, which
means that if the BladeCenter unit and operating system support hot-swap capability, you can
remove or install the component while the BladeCenter unit is running. (Orange can also
indicate touch points on hot-swap components.) See the instructions for removing or installing
a specific hot-swap component for any additional procedures that you might have to perform
before you remove or install the component.

•

You do not have to turn off the BladeCenter unit to install or replace any of the hot-swap
modules on the front or rear of the BladeCenter unit.

•

When you install a switch module in the BladeCenter unit, you must also install a compatible
I/O expansion card in the blade server to support the switch module.

•

When you are finished working on the blade server or BladeCenter unit, reinstall all safety
shields, guards, labels, and ground wires.

•

For a list of supported optional devices for the BladeCenter unit and other IBM products, see

http://www.ibm.com/servers/eserver/serverproven/compat/us/

.

System reliability guidelines

To help ensure proper cooling, performance, and system reliability, make sure that the following
requirements are met:

•

Each of the module bays on the rear of the BladeCenter unit contains either a module or a filler
module.

•

A removed hot-swap module is replaced with an identical module or filler module within 1
minute of removal.

•

A removed hot-swap blade server is replaced with another blade server or filler blade within 1
minute of removal.

•

The ventilation areas on the sides of the blade server power modules and blowers are not
blocked.

•

You have followed the reliability guidelines in the documentation that comes with the
BladeCenter unit.