Hardware Installation

Power protection

•

If possible, use a circuit dedicated to data processing equipment. Commercial electrical
contractors are familiar with wiring for data processing equipment and can help with the load
balancing of these circuits.

•

Install surge protection. Be sure to use a surge protection device between the electricity source
and the Mobility RFS9510 Controller.

•

Install an Uninterruptible Power Supply (UPS). A UPS provides continuous power during a
power outage. Some UPS devices have integral surge protection. UPS equipment requires
periodic maintenance to ensure reliability. A UPS of the proper capacity for the data processing
equipment must be purchased.

Hardware installation

The following sections describe the hardware installation for the Mobility RFS9510 Controller:

CAUTION

A Mobility RFS9510 Controller requires a two man lift. Use all appropriate cautions.