Site preparation, Getting started, Pre-installation checklist – Brocade Mobility RFS9510 Controller Installation Guide User Manual

Page 6: Location & equipment, Additional equipment recommended

Advertising
background image

2

Brocade Mobility RFS9510 Controller Installation Guide

53-1002918-01

Site preparation

1

•

Do not install this equipment or work with its power circuits during thunderstorms or other
weather conditions that could cause a power surge.

•

Verify there is adequate ventilation around the device, and ambient temperatures meet
equipment operation specifications.

Site preparation

•

Consult your site survey and network analysis reports to determine specific equipment
placement, power drops, and so on.

•

Assign installation responsibility to the appropriate personnel.

•

Identify and document where all installed components are located.

•

Provide a sufficient number of power drops for your equipment.

•

Ensure adequate, dust-free ventilation to all installed equipment.

•

Identify and prepare Ethernet and console port connections.

•

Verify cable lengths are within the maximum allowable distances for optimal signal
transmission.

Getting started

This guide provides a pre-installation checklist and instructions for installing the Mobility RFS9510
Controller, accessing the Graphical User Interface (GUI), and performing initial configuration.

Pre-installation checklist

Location & equipment

Mobility RFS9510 Controller shipping container contents:

•

Mobility RFS9510 Controller

•

Locking front bezel with keys

•

Mounting rail kit

•

Brocade Mobility RFS9510 Controller Installation Guide (this document)

NOTE

Keep the front bezel keys in a secure location which can only be accessed by authorized personnel.

Additional equipment recommended

•

Standard, grounded 100-240 VAC 50/60 Hz connection

•

UPS (uninterruptable power supply)

•

Standard 19-inch rack (2U height) with mounting rails.

Advertising