Site preparation

1

Brocade Mobility RFS7000-GR Controller Installation Guide

3

53-1001946-01

•

Brocade strongly recommends the use of an Uninterruptible Power Supply
(UPS) that supports the IP-RFS7000 power rating. Not using a UPS can result in
data loss or equipment damage due to a power surge or power failure.

•

Verify that the power connector and socket are accessible at all times during
the operation of the equipment.

•

Do not work with power circuits in dimly lit spaces.

•

Do not install this equipment or work with its power circuits during
thunderstorms or other weather conditions that could cause a power surge.

•

Verify there is adequate ventilation around the device, and ambient
temperatures meet equipment operation specifications.

Site preparation

•

Consult your site survey and network analysis reports to determine specific
equipment placement, port capacity, power drops, and so on.

•

Assign installation responsibility to the appropriate personnel.

•

Identify where all installed components are located.

•

Verify appropriate rack mounting requirements.

•

Provide a sufficient number of power drops for your equipment.

•

Ensure adequate, dust-free ventilation to all installed equipment.

•

Identify and prepare Ethernet and console port connections.

•

Verify that cable lengths are within the maximum allowable distances for
optimal signal transmission.

•

Verify that the Brocade Mobility RFS7000-GR Controller is powered through an
Uninterruptible Power Supply (UPS).