Burcam 400535 SEWAGE PUMP 1/2HP 115V IMP. CAST IRON WITH VERTICAL SWITCH User Manual

Installation instructions, Sewage pump

Advertising
background image

2190 Boul. Dagenais West

TEL: 514.337.4415

LAVAL (QUEBEC)

FAX: 514.337.4029

CANADA
H7L 5X9 [email protected]

INSTALLATION

INSTRUCTIONS

MODEL

400535

SEWAGE

PUMP

Please read these

instructions

carefully. Failure

to comply to

instructions and

designed

operation of
this system,

may void the

warranty.

©

201

1 BUR-CAM Printed in Canada 410085

W W W. B U R C A M . C O M

Your pump has been carefully packaged at the
factory to prevent damage during shipping.
However, occasional damage may occur due to
rough handling. Carefully inspect your pump
for damages that could cause failures.
Report any damage to your
carrier or your point of purchase.

INITIAL START UP PROCEDURES:
1.

Inspect the pump and the sewage tank for

any obvious condition that may

necessitates cleaning, correction,

adjustement or repair.

2.

Assure that the pump is secure and

vertical for proper operation.

3.

Assure that there is adequate clearance

from any combustible materials or

structure. Stored materials must be kept

away from the pump. Shelves or cabinet

structures must not be in close proximity

over the pump.

4.

Assure that the motor is securely plugged

into a proper ‘GFCI’ electrical outlet.

5.

Test the ‘GFCI’ outlet by pressing its test

switch. This should prove that the outlet is

energized and will trip off to protect against

a ground fault. Be sure to reset the ‘GFCI’

by pressing its reset switch.

(Repeat this step monthly)

6.

Lift the float to assure that the pump will

start when required. (Step 7 below will test

submersible pumps with enclosed floats).

7.

Pour pails of water in the sewage tank to

turn the pump on. Assure that any check

valve present will permit the sewage to flow.

8.

Observe that the plumbing can pump the

sewage safely out of the residence.

(Repeat this step monthly)

Advertising