Star Water Systems S1203 User Manual

Page 7

Advertising
background image

12

13

NOTE: Installing the grinder/tank unit behind a wall will

require an extension kit (P/N 023260) sold separately.

1. Place the toilet assembly a minimum of 1/2" from the

wall and mark the closet screw set locations on the floor.

Grinder/

tank unit

Toilet Tank Bottom and Sides

IL1743

HIDDEN PUMP UNIT INSTALLATION

1. Cut and dry-fit the pipe and fittings as required for

1" diameter discharge pipe (may be reduced to 3/4"

diameter if codes permit). While dry-fitting the discharge

pipe, position and mark the location of the grinder/tank

unit discharge fitting.

PIPING

2. Position the grinder/tank unit behind the wall. Measure

the appropriate length of 3½ in. Schedule 40 PVC pipe

provided with the extension kit and cut it to length. Set

toilet aside.

CAUTION: Toilet assembly is top heavy. Take special

precautions to ensure that toilet does not tip over and

break.

IL1744

Grinder/tank

unit

Sched 40

PVC Pipe

2. Cut and dry-fit 1-1/2 in. vent pipe as required to

ensure that the vent pipe does not interfere with other

components. Make the connection to the grinder/tank

unit with the provided street elbow.

CAUTION: Proper venting is required for the toilet to

flush. Do not use a mechanical type vent.

3. A 2 in. x 1 in. 90° discharge fitting and a 1-1/2 in.

street elbow vent fitting have been provided for space

constraints in an exposed configuration. However, these

are not required for a hidden (behind a wall) installation.

On a hidden installation, simplify installation and

improve performance by replacing the 90° discharge

fitting with a straight discharge pipe instead. Use a 2 in.

straight coupling and reduce it down to 1 in.

1 in.

Discharge

Pipe and

Fittings

IL1745

Grinder/tank unit

discharge fitting

IL1746

Discharge

Pipe

Vent Pipe

Street

Elbow

IL1747

1 in.

Discharge

Pipe

2 in.

Coupling

1

2

1

2

3

Advertising
This manual is related to the following products: