Ft5000 u – Triton FT5000 User Manual User Manual
Page 146

126
M
ODEL
FT5000 U
SER
M
ANUAL
Shut Down / Apply Power Using Power Supply ON/OFF Switch
D
1.
Open the sleeve door panel of the ATM by unlocking and pulling the door
open.
2.
Locate the ON/OFF switch on the POWER SUPPLY, as shown in Figure 7-9.
Move switch to the OFF <0> position.
3.
To RESTART after shut down, move the ON/OFF switch to the ON <I> position.
4.
The terminal software will re-initialize. The terminal will automatically attempt to
clear any error conditions during the start-up sequence. This may take several
minutes. When complete, the top menu appears.
After about a 30-second delay, one of two screens will appear:
•
If the error condition was successfully cleared, the Customer Welcome
screen will appear. The terminal will resume normal operations.
•
If the error condition was not successfully cleared (or another error condition
exists) the Terminal Error screen will appear.
Fig. 7-9. Power supply ON/OFF
switch location.