Video Mount Products LCD-1 User Manual

Page 3

Advertising
background image

Step 1
Before starting, lay out all parts to your mount and match them to
the parts list provided. Verify that you have all your parts before
attempting to assemble the mount.

Step 2
Attach the mounting plate to your LCD monitor using the M4
or M5 screws or as appropriate.

Step 3
For Wood Stud Installation:
Mark the wall or desired mounting surface in preparation of installa-
tion of wall mounting plate

(1)

. Pre drill pilot holes using a 7/32” drill

bit to a depth of 2.5”. Attach the wall plate

(1)

to the wooden stud

using the 5/16” by 2.5” long lag screw

(21)

and washer

(22)

making

sure the small rotation stoppers on the wall plate are towards the
bottom. WARNING: It is important that the mount is attached in
the center and NOT the edges of the stud for safe support. Please
verify that your mounting surface will support the combined weight
of your mount, mounting hardware, and flat panel. Also verify that
the mounting surface is safe to drill through. If in doubt or uncertain
about any of the above, please contact a professional installer.
Improper installation invalidates the UL listing of the product.

Step 4
For Concrete Installation:
Mark the wall or desired mounting surface in preparation of instal-
lation of wall mounting plate

(1)

. Pre drill pilot holes using a 3/8” or

M10 drill bit to a depth of 2.5”. Clean out the pre drilled hole with
a vacuum or compressed air. Insert the concrete anchor

(23)

into

the pre drilled hole and tap the anchor flush with the surface of
the concrete with a hammer. NOTE: If drywall is on the surface of
the concrete the anchor must be countersunk so it is flush with the
surface of the concrete below. Also note the dry wall thickness
should not exceed 5/8”. Concrete covered by drywall mounting
condition has not been evaluated by UL.
Attach the wall plate

(1)

to the concrete wall by screwing the 5/16” by 2.5” long lag

screw

(21)

and washer

(22)

into the concrete anchor

(23)

making

sure the small rotation stoppers on the wall plate are towards the
bottom. WARNING: Please verify that your mounting surface will
support the combined weight of your mount, mounting hardware,
and flat panel. Also verify that the mounting surface is safe to drill
through. If in doubt or uncertain about any of the above, please
contact a professional installer. Improper installation invalidates
the UL listing of the product.

Step 2: Attaching the monitor

to the mounting plate

Step 3: Attaching the wall

plate to the wooden stud

20

23

1

5

19

1

1

1

21

22

21

22

23

Step 4: Setting the concrete anchor

into drywall covered concrete wall

(not evaluated by UL)

Step 4: Setting the concrete anchor

into bare concrete wall

Advertising