Edwards Signaling EBPS Remote Booster Power Supply User Manual

Page 36

Advertising
background image

30

Remote Booster Power Supply Technical Reference Manual

Notes
•

CC1(S) modules must be wired and programmed on the Signature controller for proper
operation.

•

Any BPS trouble causes the CC1(S) supervision to report a trouble to the main control panel
when DIP switch SW2-6 is on. AC power failure is delayed for three hours.

•

CC1(S) wiring must be within three feet of the BPS enclosure and in conduit or mounted
within the BPS’s enclosure. If CC1(S) wiring is more than three feet from a BPS enclosure,
then a separate listed EOL relay (PAM1, 6254A-003, or 73402A) or equivalent must be used
to supervise the 200 mA AUX circuit wiring.

•

When configured for AC power loss reporting using the trouble relay (DIP switch SW2-6 ON),
the CT1 module supervises and reports the AC power loss to the control panel. When DIP
switch SW2-6 is OFF, the CT1 module is not required.

Figure 19: Multiple CC1(S) modules using the BPS’s sense inputs

+

+

+

+

+

TB2

TB1

(16)

(15)

(15)

TB

5

(17)

4

8

3

7

2

6

10

1

5

9

+

+

CC1(S)

4

8

3

7

2

6

10

1

5

9

+

+

CC1(S)

+

+

+

(19)

(16)

CT1

(18)

+ +

(1)

(2)

(3)

(4)

(5)

(6)
(7)

(8)
(9)

(10)
(11)
(12)
(13)
(14)

Advertising