Operation – KROHNE DK 37 NEPSI Ex i User Manual

Page 12

Advertising
background image

5

OPERATION

12

DK37/M8 - H250/M8

www.krohne.com

09/2013 - 4002616801 AD DK37 NEPSI Ex ia R01 en

Operation

5.1 Start-up

Start-up is only permitted when the variable area flowmeter:

• is correctly installed in the system and connected.
• has been checked for the proper state with regard to its installation and connection

requirements.

The user of the system must have it checked before start-up in compliance with the national
regulations for checks before startup.

5.2 Operation

Setting of the limit switches may be carried out during operation. Remove the housing cover to
this purpose. The housing cover has to be closed immediately after the limit switches have been
set.

AD_DK37_NEPSI_Ex_ia_R01_en_4002616801_PRT.book Page 12 Friday, September 13, 2013 8:50 AM

Advertising