Cables and batteries, Prepare for cables – APC MGE 300 User Manual

Page 7

Advertising
background image

3

MGE™ Galaxy™ 300 10-40 kVA 3:3, 10-30 kVA 3:1 - 380/400/415 V Installation

Cables and Batteries

Note: The battery enclosure must be installed on a non-inflammable, level and solid floor.

Prepare for Cables

1. Open the front door.

2. Remove both side panels.

Front view

Front view

Advertising