Make sure that the wallbox is earthed if it is metal. Ensure that all

three terminals are tight before screwing the two plate fixing screws

supplied home sufficiently to locate the DS2 securely to the wall box.

Turn ON the mains supply.
If further DS2’s are required to control the same load they must

have all corresponding terminals wired in parallel with these

on the first DS2.

3. Commissioning.

Press the push button and the light(s)/appliance(s) under control

should come ON for approximately 3 seconds. During this time the

neon behind the push button switches off. If the load under control is

low energy or fluorescent lamps they will not switch ON immediately

and the light intensity may be reduced initially.
Having established that the DS2 is working correctly the mains supply
should be turned OFF and the two fixing screws removed from the

unit. The DS2 can then be pulled away from the wall to enable access

to the delay time adjuster and 2 gang range switch (see fig 2). The

delay time can then be set to the required level by setting the 2 gang

range switch according to table 1 and then adjusting the delay time

adjuster. The DS2 can then be fixed to the wall again using the two

fixing screws. The push in screw covers can now be fitted if required.
The mains supply should be turned ON and the push button pressed

to ensure the delay time is correct.

All delay times accurate to ±25%. Black – switch lever.

2 Gang Range Switch Position Adjuster Min. Adjuster Max.

3 sec.

30 sec.

12 sec.

2 min.

1 min. 30 sec. 16 min. 30 sec.

12 min. 30 sec. 2hrs. 10 min.