Installation, English, Window requirements installation kits contents – LG LW1012CR User Manual

Page 11

Advertising
background image

Owner’s Manual 11

ENGLISH

Installation

Installation

Window Requirements

Installation Kits Contents

8

7

9

10

3

12

11

16

17

1

6

13

15

4

14

2

5

21" min.

40

1

/

2

" max.

15

1

/

2

"

min.

21

1

/

2

" min.

15

1

/

2

" min.

16

1

/

2

" max.

Horizontal sliding window

Casement window

NO.

NAME OF PARTS

QTY

1

Curtain

1

2

Curtain Frame

1

3

Upper Guide

1

4

Side Guide

2

5

Support Bracket

1

6

Bracket

1

7

Leveling Bolt & Nut

1

8

Bolt

2

9

Nut

2

10

Washer

2

11

Side Guide seal

1

12

Foam Seal Strip

1

13

Window Track Seal

1

14

Window Locking Bracket

1

15

Screw (Type A)

9

16

Screw (Type B)

3

17

Screw (Type C)

8

1. These instructions are for a horizontal sliding

or a casement window.

2. The electrical outlet must be within reach of

the power cord.

For installation in a casement window, the
window frame assembly and the side of the
building must be adequate to support the weight
of the air conditioner.

Advertising