Unpacking and removing shipping bolts 11 – LG WM3001HWA User Manual

Page 11

Advertising
background image

I N S TA L L AT I O N I N S T RU C T I O N S

When removing the washer from the carton base, be

sure to remove the foam tub support in the middle of the

carton base.
If you must lay the washer down to remove the base

packaging materials, always lay it carefully on its side. Do

NOT lay the washer on its front or back.
IMPORTANT: To prevent internal damage during transport,

the washer is equipped with 4 shipping bolts and plastic

retainers. These bolts and retainers

MUST be removed

before operating the washer.
• Failure to remove shipping bolts and retainers may cause

severe vibration and noise, which can lead to permanent

damage to the washer. The cord is secured to the back of

the washer with a shipping bolt to help prevent operation

with shipping bolts in place.

Remove the retainers by turning them slightly

while pulling. Rotate and press the hole caps

into the shipping bolt holes.

Starting with the bottom 2 shipping bolts,

use the included wrench to remove the

4 shipping bolts by turning them

counterclockwise.

1

Shipping

Bolts

2

NOTE: Save the bolts and retainers for

future use. To prevent damage to internal

components, the shipping bolts and

retainers must be installed when

transporting the washer.

Retainer

Hole Cap

Carton Base

Foam Tub

Support

UNPACkINg AND REmOVINg SHIPPINg BOLTS

11

Advertising