Verifying proper operation, Returning the failed component, Installing a power supply – HP 3000 Enterprise Virtual Array User Manual

Page 99

Advertising
background image

2.

Connect the power cord to the power supply and engage the cord lock.

Figure 45 Installing a power supply

Verifying proper operation

After replacing the power supply or blower, check the following to verify that the component is operating

properly:

NOTE:

It may take up to 10 minutes for the component to display good status.

•

Make sure the blower begins operating immediately.

•

The status indicator should be on.

•

From HP Command View EVA:
• Navigate back to the component and check the status. It should be

.

• Turn off the locate function by clicking Locate > Locate Off.

Returning the failed component

Follow the return instructions provided with the new component.

HP StorageWorks 3000/5000 Enterprise Virtual Array user guide (VCS 4.xxx)

99

Advertising