Management station requirements, Management station requirement, Hardware requirements – HP Hub & Switch Management for OV-UX User Manual

Page 12: Software requirements

Advertising
background image

2-2

Before Installing HP Hub & Switch Management for OV-UX
Management Station Requirements

B

e

fo

re I

n

st

all

ing H

P

H

ub &

S

w

it

ch M

a

n

agement

for O

V

-

Management Station Requirements

Hardware

The following table shows the recommendations for HP 9000 hardware.

Software

The following table shows the software that must be installed, configured,
and verified to run properly prior to installing HP Hub & Switch
Management. These prerequisites assume that you are running a single
HP OpenView Windows (ovw) session.

HP 9000 Systems with HP-UX 10.20 or 11.00

Models

all (except 705 with Series 700)

Memory
(minimum megabytes)

64 MB*

Disk Space
(minimum megabytes**)

150 MB

Monitor

Color with at least 1280 x 1024 resolution

Color planes

8

Mouse

Yes

* The larger your IP network or the more HP OpenView Windows (ovw) sessions you run,
the more memory you will need. A good guideline is 10 megabytes for every additional 500
nodes, or 25 megabytes of memory for every additional ovw session that you expect to run.

**Includes HP OpenView Network Node Manager.

HP 9000 Systems

OS version

HP-UX 10.20 and 11.00

OS configured swap space
(minimum megabytes)

120 MB*

Type of window software

X Window with OSF/Motif/CDE

LAN software

LAN/Link for HP 9000 & ARPA Services/9000

Advertising