Secondary pcie riser cage option – HP ProLiant DL385p Gen8 Server User Manual

Page 74

Advertising
background image

Hardware options installation 74

o

Install the primary PCIe riser cage (on page

31

).

o

Install the secondary PCIe riser cage ("

Secondary PCIe riser cage option

" on page

74

).

11.

Do one of the following:

o

Secure the primary PCIe riser cage full-length expansion board retainer (on page

32

).

o

Secure the secondary PCIe riser cage full-length expansion board retainer (on page

33

).

12.

Install the access panel (on page

25

).

13.

Install the server into the rack ("

Installing the server into the rack

" on page

40

).

14.

Connect each power cord to the server.

15.

Connect each power cord to the power source.

16.

Power up the server (on page

23

).

Secondary PCIe riser cage option

WARNING:

To reduce the risk of personal injury, electric shock, or damage to the equipment,

remove the power cord to remove power from the server. The front panel Power On/Standby

button does not completely shut off system power. Portions of the power supply and some internal

circuitry remain active until AC power is removed.

CAUTION:

To prevent improper cooling and thermal damage, do not operate the server unless

all PCI slots have either an expansion slot cover or an expansion board installed.

IMPORTANT:

The secondary PCI riser cage option requires both processors.

To install the component:

1.

Power down the server (on page

23

).

2.

Remove all power:

a.

Disconnect each power cord from the power source.

b.

Disconnect each power cord from the server.

3.

Extend the server from the rack (on page

23

).

4.

Remove the access panel (on page

25

).

Advertising