Installing the server into the rack – HP ProLiant DL385 G7 Server User Manual
Page 35

Setup 35
Installing the server into the rack
CAUTION:
Always plan the rack installation so that the heaviest item is on the bottom of the
rack. Install the heaviest item first, and continue to populate the rack from the bottom to the
top.
1.
Install the server and cable management arm into the rack. For more information, see the installation
instructions that ship with the 2U Quick Deploy Rail System.
2.
Connect peripheral devices to the server.
Item Description
Color
1
PCI slot 5
—
2
PCI slot 6
—
3
PCI slot 4
—
4
PCI slot 2
—
5
PCI slot 3
—
6
PCI slot 1
—
7
Power supply 2
—
8
Power supply 2 connector
—
9
Power supply 1
—
10
Power supply 1 connector
—
11
USB connectors (2)
Black
12
Video connector
Blue
13
NIC 1 connector
—
14
NIC 2 connector
—
15
Mouse connector
Green
16
Keyboard connector
Purple
17
Serial connector
—
18
iLO 3 connector
—
19
NIC 3 connector
—
20
NIC 4 connector
—