Figure 76 – HP Insight Management-Software User Manual
Page 119
Advertising

Figure 76 Move profile prevalidation table
VCEM performs five validation steps during the export process as displayed in
. These
five steps validate source and target resources associated with the export operation. These steps
also validate feature compatibility between the server profile and the target VC Domain Group as
well as certifying feature compatibility specific to network and fabric features.
describes the status for each prevalidation step.
Moving a server profile
119
Advertising
This manual is related to the following products: