HP ProLiant DL360 G6 Server User Manual

Page 30

Advertising
background image

Setup 30

WARNING:

This server is very heavy. To reduce the risk of personal injury or damage to the

equipment:

Observe local occupational health and safety requirements and guidelines for manual
material handling.

Get help to lift and stabilize the product during installation or removal, especially when the
product is not fastened to the rails. When the server weighs more than 22.5 kg (50 lb), at least

two people must lift the server into the rack together. A third person may be required to help
align the server if the server is installed higher than chest level.

Use caution when installing the server in or removing the server from the rack; it is unstable

when not fastened to the rails.

CAUTION:

Always plan the rack installation so that the heaviest item is on the bottom of the rack.

Install the heaviest item first, and continue to populate the rack from the bottom to the top.

1.

Install the server and cable management arm into the rack. See the installation instructions that ship with
the HP 1U Quick Deploy Rail System.

2.

Connect the peripheral devices to the server.

Item

Description

1

Slot 1 PCIe2 x8 (8, 4, 2, 1)

2

Slot 2 PCIe2 x16 (16, 8, 4, 2, 1), 75W +EXT 75W*

3

Power supply bay 1 (populated)

4

Power supply bay 2

5

iLO 2/NIC connector

6

Serial connector

7

Video connector

8

Mouse connector

9

Keyboard connector

10

NIC 2 connector

11

NIC 1 connector

12

USB connectors (2)

*This expansion slot provides 75 W of power to an adapter, with an additional 75 W of power supplied by external

power.

3.

Connect the power cord to the server.

Advertising