Installation instructions, Cut holes, For recessed-bottom cabinets only – GE JV536HSS User Manual

Page 14: Run wires, Screw in partway, Feed in wires, Secure hood

Advertising
background image

14

Installation Instructions

CUT HOLES

Cut holes at marked locations for duct and electrical

wiring. For the vertical duct, cut out 3/4”H[WUDWRZDUG

the front of the cabinet so you can move the duct

freely when installing the hood. It may also ease

installation by cutting the hole 10

1

ø

2

” instead of 10”.

FOR RECESSED-BOTTOM CABINETS

ONLY

RUN WIRES

Run the electrical wires through the wall or

cabinet according to National Electrical Code

and applicable local codes.

NOTE: DO NOT turn the power on until installation is

complete.

12

11

13

SCREW IN PARTWAY

Drive a mounting screw (from the hardware packet)

partway into each center of the narrow neck of the

keyhole slots marked on the cabinet bottom.

FEED IN WIRES

Lift the hood into position and feed the house

wiring through the wiring knockout.

14

15

Wood shims

• If the cabinets have front, side or back trim, make

2 wood shims the width of the trim and attach them to

the cabinet bottom recess on both sides. See Step 9 for

marking locations.

SECURE HOOD

Slide the hood back against the wall. Tighten the

mounting screws. Be sure the screw heads are in

the narrow neck of the keyhole slot.

Keyhole (4)

Mounting
screw (4)

16

Advertising