Without, Installation preparation, Preparation – GE PSB9120DFBB User Manual

Page 7: An accessory storage drawer, Caution, Precaución

Advertising
background image

Installation Preparation

7

Preparation

WITHOUT

an Accessory Storage Drawer

PREPARE THE OPENING (cont.)

Installation over a GE/Monogram Oven and

Warming Drawer:

NOTE: Additional clearances between the cutouts

may be required. Check to be sure the oven

supports above the Warming Drawer location

do not obstruct the required interior depth

and height. See Warming Drawer installation

instructions for details.

CAUTION:

For personal safety, the

mounting surface must be capable of supporting

the cabinet load, in addition to the added

weight of this approximate 80-pound oven, plus

additional oven loads of up to 50 pounds or a

total weight of 130 pounds.

PRECAUCIÓN:

Para seguridad

personal, la superficie de montaje debe poder

soportar la carga del gabinete, además del peso

aproximado de 80 libras del horno, más las

cargas adicionales del horno de hasta 50 libras

o un peso total de hasta 130 libras.

Construct Solid

Bottom Min.

3/8s Plywood

Supported by

2 x 4 or 2 x 2

Runners all

Four Sides

30s

23-1/2s

25-1/4s

17-1/2s

2

s

Min.

(3

s

Recommended)

Per Oven

Requirement

2

s

Min.

(3

s

Recommended)

PREPARE THE OPENING (cont.)

Installation over a GE/Monogram oven:

‡,I\RXDUHUHSODFLQJD*(0RQRJUDPHOHFWULF

double oven with the combined installation of

an Advantium 120V and a single oven, use the

dimensions shown. The middle rail separating

the two openings may need to be larger than the

2s minimum shown.

30s

23-1/2s

25-1/4s

17-1/2s

2

s

Min.

(3

s

Recommended)

Construct Solid

Bottom Min.

3/8s Plywood

Supported by

2 x 4 or 2 x 2

Runners all

Four Sides

Per Oven

Requirement

Per Warming

Drawer

Requirement

Advertising
This manual is related to the following products: