Installation Preparation

PREPARE THE OPENING

(CONT.)

Installation over a GE Warming Drawer:

NOTE: Additional clearances between the cutouts

may be required. Check to be sure the oven supports

above the Warming Drawer location do not obstruct

the required interior depth and height. See Warming

Drawer installation instructions for details.

µ

µ

µ

µ

µ

µ

Min.

µ0LQ

,QVWDOO[RU

[5XQQHUV

or Solid

Bottom. Must

Support 100

lbs.

Construct

Solid Bottom
0LQµ

Plywood

Supported
E\[RU

[5XQQHUV

all Four Sides

PREPARE THE OPENING

The Advantium 120 can be installed in combination

with other GE appliances. Always follow each

product’s Installation Instructions to complete

the installation.

Single Advantium 120 Installation:

2UGHUDµZLGHVLQJOHRYHQFDELQHWRUFXWWKH

opening in a wall to the dimensions shown.

‡$OZD\VPDLQWDLQµPLQLPXPKHLJKWIURP

the floor to the cutout in any single or combined

installation.

‡$OORZµFDVHWULPRYHUODSDWWKHWRSDQG

µRYHUODSRQWKHERWWRPDQGHDFKVLGHRIWKH

opening.

‡2YHQRYHUODSVZLOOFRQFHDOFXWHGJHVRQDOOVLGHV

of the opening.

When installed over a single oven or a warming
GUDZHUDOORZDWOHDVWµEHWZHHQWKHWZRRSHQLQJV

This separation will provide clearance for bottom

overlap of the Advantium 120 and the other

appliance overlaps.

&RQVWUXFWDVROLGRYHQIORRURIµPLQWKLFN
SO\ZRRGVXSSRUWHGE\[UXQQHUVRQDOOVLGHV
‡7KHVXSSRUWPXVWEHOHYHODQGULJLGO\PRXQWHG

flush with the bottom edge of the cutout.