Installation preparation, Caution – GE PSB9100DFBB User Manual

Page 7

Advertising
background image

Installation Preparation

PREPARE THE OPENING

(CONT.)

Installation over a GE Oven and Warming

Drawer:

NOTE: Additional clearances between the cutouts

may be required. Check to be sure the oven

supports above the Warming Drawer location do

not obstruct the required interior depth and height.

See Warming Drawer installation instructions for

details.

CAUTION:

For personal safety, the

mounting surface must be capable of supporting

the cabinet load, in addition to the added weight

of the 75-pound product, plus additional oven

loads of up to 50 pounds or a total weight of 125

pounds.

REMOVE THE PACKAGING

‡/LIWWKHRYHQRXWRIWKHFDUWRQ
‡5HPRYHDOOSDFNLQJPDWHULDODQGWDSH
‡2SHQWKHGRRUDQGUHPRYHSDUWVER[
‡/RFDWHSDUWVSDFNDJHFRQWDLQLQJPRXQWLQJVFUHZV

Construct

Solid Bottom
0LQµ

Plywood

Supported by
[RU[

Runners all

Four Sides

µ

µ

µ

µ

µ0LQ

Per Oven

Requirement

µ

µ

µ0LQ

7

PREPARE THE OPENING

(CONT.)

Installation over a GE Oven:

* If you are replacing a GE electric double oven

with the combined installation of an Advantium

120 and a single oven, use the dimensions shown.

The middle rail separating the two openings may
QHHGWREHODUJHUWKDQWKHµPLQLPXPVKRZQ

µ

µ

µ

µ

µ0LQ

µ

Min.

Construct Solid

Bottom Min.
µ3O\ZRRG

Supported by
[RU[

Runners all

Four Sides

Per Oven

Requirement

Advertising
This manual is related to the following products: