3 install duct bracket, Install mounting bracket – GE ZV900SLSS User Manual

Page 16

Advertising
background image

Installation Instructions

,167$//$7,21³5(&,5&8/$7,1*

16

3 INSTALL DUCT BRACKET

The duct bracket should be installed against the

back wall and flush with the ceiling. This bracket will

hold the duct cover in place at the top.
Secure the bracket to the wall:

• Align the marked centerline on the bracket with

the centerline on the wall.

• Mark 2 screw hole locations in the wall.
• Drill 3/16

d

pilot holes in the marked locations.

• If pilot holes do not enter studs, enlarge the holes

to 3/8

d

and install wall fastener anchors.

• Drive screws, by hand, into the fasteners to allow

anchors to expand. Remove the screws.

• Secure the bracket to the wall with wood screws

and/or fasteners.

 INSTALL MOUNTING BRACKET

This vent hood must be secured to the horizontal

support or wall studs.
• With the template taped in place, use a punch to

mark mounting bracket screw locations.

• Drill 3/16" pilot holes in 2 of the punched locations

in the lower bracket.

• Remove the template.

• Use wood screws to secure the mounting bracket

to the wall. The screws must engage wall studs or

the installed horizontal mounting support.

• Check to be sure that the bracket is level.

14-5/8≤

to top of

bracket

C

L

t

ALIGN BOTT OM EDGE

WITH PENCIL

LINE,

INDICA TING BOTT OM

OF THE HOOD

Drill 2 (two) 3/16≤ pilot holes through studs or rear wall support

REAR WALL

MOUNTING

TEMPLA TE

49-80405 04-06 JR

Advertising