Installation preparation, Caution, Prudence – GE ZV900SLSS User Manual

Page 6

Advertising
background image

Installation Preparation

REMOVE THE PACKAGING

CAUTION:

LIFT THE HOOD OUT OF THE BOX

BY THE CENTER METAL PORTION. DO NOT LIFT BY THE

GLASS SIDES.

PRUDENCE :

LEVEZ LA HOTTE À

L’EXTÉRIEUR DE LA BOÎTE PAR LA PORTION MÉTAL

CENTRAL. NE LEVEZ PAS PAR LES CÔTÉS DE VERRE.

CAUTION:

Wear gloves to protect against

sharp edges.

PRUDENCE :

Portez des gants pour éviter

les blessures causées par les tranchants.

• Grasp the hood by the metal insert in the center

and lift straight up and out of the box.

• Remove and properly discard the plastic wrapping.
• Remove parts box, duct covers and other

packaging.

TOOLS AND MATERIALS REQUIRED

(NOT SUPPLIED

)

“ Tape measure
“ Knife
“ Spirit level
“ Wire cutter/stripper
“ Wire nuts
“ Electric drill with 5/16" and 3/8" bits
“ Phillips and flat blade screwdrivers
“ Hammer
“ Pliers
“ Safety glasses
“ Duct tape
“ Tape to mount template
“ Gloves to protect against sharp edges
“ 120V 60Hz. 15 or 20 Amp, 2 wire with

ground Properly grounded branch circuit

“ Strain relief for junction cover
“ 8" round metal duct, length to suit

installation

“ Saw, jig saw or reciprocating saw

Measuring tape

Electric drill

with 5/16”

and 3/8” Bits

12” long

Phillips

head

screwdriver

Safety glasses

Gloves

Spirit level

Knife

Wire cutter/

stripper

Flat blade

screwdriver

Hammer

Pliers

Duct tape

Masking tape

Wire nuts

Strain relief

Saw, jig saw or

reciprocating

saw

6

8" round metal

duct, length to suit

installation

Advertising