GE ZIBS240PSS User Manual

Page 3

Advertising
background image

3

CARING FOR YOUR STAINLESS STEEL

• Before installation or first use, we strongly advise that

you polish the stainless steel exterior and handle with
a commercially available stainless steel cleaner such as
Stainless Steel Magic.

To preserve and protect the fine

finish, we also strongly advise that you apply stainless
steel cleaner monthly.

STAINING WOOD DRAWER FRONTS

The drawer fronts are unfinished cherry wood. During use,
oil from hands may accumulate and stain the wood.
• The drawer fronts may be stained and sealed to match

adjacent cabinetry.

• Apply the stain and sealer according to the manufacturer’s

instructions. To avoid unpleasant odor, keep the door open
to ventilate and allow the stain/sealer to dry completely
before using the product.

CONTENTS

Important Information
Parts Required..............................................................................................................3
Caring for Your Stainless Steel ..........................................................................3
Tools, Hardware ........................................................................................................3
Staining Wood Drawer Fronts ..........................................................................3
Install Water Line ......................................................................................................3
Design Guide (For ZIFS240 and ZIBS240)
The Installation Space ............................................................................................4
Side-by-Side Installations ....................................................................................5
Product Clearances ..................................................................................................5
Design Guide (For ZIFI240 and ZIBI240)
The Installation Space ............................................................................................6
Side-by-Side Installations ....................................................................................7
Product Clearances ..................................................................................................7
Installation Instructions
Step 1, Remove Packaging and Installation Parts ................................8
Step 2, Install Custom 3/4" Door Panel and Handle
(ZIFI240 and ZIBI240 models only) ............................................................8, 9
Step 3, Leveling............................................................................................................9
Step 4, Connect Water Supply
(ZIBI240 and ZIBS240 models only) ............................................................9
Step 5, Connect Power ........................................................................................10
Step 6, Slide Product into Cutout ..................................................................10
Step 7, Set Temperature Controls ................................................................10

TOOLS/HARDWARE REQUIRED

• Adjustable wrench
• Carpenter’s glue (ZIFI240 and ZIBI240 models only)
• Screwdriver (ZIFI240 and ZIBI240 models only)

• A cold water supply is required for automatic icemaker

operation. The water pressure must be between 20 and
120 p.s.i.

• The water line can enter the opening through

the floor or back wall. Route 1/4" O.D. copper tubing or GE
SmartConnect

kit between the cold water line and water

connection location, long enough to extend to the front of
the refrigerator.

• Install an optional water filter in the water line near the

refrigerator. A water filter is recommended in areas where
the water supply contains sand and particles. Installation
Instructions are packed with the filter.

NOTE: The only GE approved plastic tubing is supplied in
the GE SmartConnect

Refrigerator Tubing kits. Do not use

any other plastic water supply line because the line is under
pressure at all times. Other types of plastic may crack or
rupture with age and cause water damage to your home.
GE SmartConnect

Refrigerator Tubing Kits are available

in the following lengths:
2

′ (0.6 m)

WX08X10002

15

′ (4.6 m)

WX08X10015

6

′ (1.8 m)

WX08X10006

25

′ (7.6 m)

WX08X10025

Shut off the main water supply.
Turn on the nearest faucet long enough to clear the line
of water.
• Install a shut-off valve (required) between the icemaker

water valve and cold water pipe in a basement or cabinet.
The shut-off valve should be located where it will be easily
accessible.

• Turn on the main water supply and flush debris. Run about

a quart of water through the tubing into a bucket. Shut off
water supply at the shut-off valve.

NOTE: Saddle type shut-off valves are included in many water
supply kits, but are not recommended for this application.

NOTE: Commonwealth of Massachusetts Plumbing Codes
248CMR shall be adhered to. Saddle valves are illegal and use
is not permitted in Massachusetts. Consult with your licensed
plumber.

INSTALL WATER LINE

(ZIBI240 AND ZIBS240 MODELS ONLY)

Floor

Water Line

Shaded Area

1-1/2"

min.

1/2"

9"

max.

10-1/2"

Water Line

PARTS REQUIRED

• Custom handle
• Assembled overlay panel
• Screws

PARTS SUPPLIED

• Handle side trim
• Optional black or

stainless steel toekick

ZIFI240 AND ZIBI240 MODELS ONLY

Installation Instructions

Advertising
This manual is related to the following products: