Caution, Warning – GE ZV750SPSS User Manual

Page 12

Advertising
background image

12

Installation Instructions

INSTALLATION – VENTED TO THE OUTSIDE

5 CONNECT DUCTWORK

• Remove shipping tape from the damper.
• Install ductwork, making connections

in the direction of airflow as illustrated.

• Push duct over the exhaust outlet and damper.

CAUTION:

Do not use sheet metal

screws at the exhaust outlet connection. Doing

so will prevent proper damper operation. Seal

connection with tape only.

• Secure joints in ductwork with sheet metal screws.
• Wrap all duct joints and the flange connections

with aluminized duct tape for an airtight seal.

Duct tape

over seam

and screw

Screw

Airflow

6 CONNECT ELECTRICAL

Verify that power is turned off at the source.

WARNING:

If house wiring is not 2-wire

with a ground wire, a ground must be provided

by the installer. When house wiring is aluminum,

be sure to use U.L.-approved antioxidant compound

and aluminum-to-copper connectors.

• Remove the junction box cover and the selected

knockout.

• Secure the house wiring to the junction box with

a strain relief (not provided).

• Connect the white lead to the branch circuit white lead.
• Connect the black lead to the branch circuit black lead.
• Connect the green/yellow lead to the branch

circuit green lead or bare ground lead.

• Secure all the connections with wire nuts on each

electrical connector.

• Push the wires into the junction box and replace

the cover. Be sure the wires are not pinched.

• Secure the junction box cover with the 2 original

screws.

Junction

box cover

Knockout

Advertising
This manual is related to the following products: