Installation preparation, Caution, Check installation hardware – GE ZV750SPSS User Manual

Page 7: Remove the packaging

Advertising
background image

CHECK INSTALLATION HARDWARE

Locate the hardware accessory box packed with

the hood and check contents.

3 charcoal filters

Air deflector with

upper duct connector

• Drill 1/8" Pilot Holes For Mounting Brackets.

Align edge 25-1/2" above Cooking Surface.

17-5/16"

3-15/16"

13-9/16"

2-5/32"

C

L

• Drill 1/8" Pilot Holes.

• Drill 1/8" Pilot Holes.

5-7/8"

Wall-mount template

10 wood

screws

10 metal wall

fasteners

2 Large

flat washers

2 Mounting brackets

3 Stainless

steel grease

filters

Decorative

duct covers

Duct cover bracket (not

required for recirculating

operation)

2 Phillips-

head duct

cover screws

2 Utensil rods with 4 machine screws

Additional Parts for Recirculation Operation

7

Installation Preparation

REMOVE THE PACKAGING

CAUTION:

Wear gloves to protect

against sharp edges.
The vent hood is shipped secured to a shipping

board with 4 screws.

• Remove the duct cover, parts box and foam

packaging.

• Lift the hood out of the box.
• Remove and properly discard the plastic wrapping.
• Remove metal grease filters and side bar packaging.

• To remove the shipping board, locate and remove

2 screws at the top of the assembly and 2 screws

inside the hood behind the filter guides on the left

and right sides. Discard the shipping board.

• Remove junction box cover.
• Remove knockout from junction box.
• Install strain relief onto junction box.

Mounting screw

Shipping board

Shipping board

Mounting screw

Mounting

screw

Knockout

Junction box

NOTE: Additional tools, materials and hardware are

required to construct your wall framing support.

Advertising
This manual is related to the following products: