Installation preparation, Tools required, Remove packaging – GE ZKD910SFSS User Manual

Page 6

Advertising
background image

6

Installation Preparation

TOOLS REQUIRED

Safety Glasses

Drill and

1/16” Bit

Measuring Tape

Phillips Screwdriver

Hand Saw

MATERIALS REQUIRED (provided)

MATERIALS REQUIRED (not provided)

Runners must be level, rigidly mounted and capable

of supporting 150 pounds.

Level

4 Wood Screws

2x2 or 2x4

Wood Block

for Anti-Tip

Security

Adhesive or other hardware for installing

runners or shelf to support warmer drawer

2x2 or 2x4

Lumber for

Runners

REMOVE PACKAGING

• Remove all packing materials and tape.
• Locate package containing 4 wood screws and set

aside.

Parts provided:

• 4 Wood Screws.

• Place carton on a flat surface.
• Open one end of the carton and lift off the top

piece.

• Lift the warmer up and out of the carton.
• Place the drawer on top of the shipping carton to

protect the drawer front and the finished flooring.

Advertising
This manual is related to the following products: