Installation preparation, Installation custom panel – GE ZBD9900RII User Manual

Page 4

Advertising
background image

4

Installation Preparation

U.S.

Metric

Height (Adjustable)

33-3/4” - 35-3/4”

857 to 908 mm

Width

23-3/8”

600 mm

Depth (Includes high

loop)

22-7/8”*

581 mm

Depth W/Door Open

49-3/4”

1266 mm

Technical Data

Electricity

120V, 60Hz, 15 amp

Water pressure:

4.2-140 psi,

0.03-1.0 MPa,

0.3-10 Bar

Heating element: 1200 watt
Max loading

1300 watt

33-3

/4" to

35-3/4"

857 to 908

m

m

22-7/8"

581 mm

49-3/4"

1266 mm

Door

5-1/4" - 7-1/4

"

135 - 185 mm

2"

50 mm

23-3/8"

600 mm

2-3/4"

70 mm

3-1/4"

85 mm

230 mm

9"

*Does not include the depth of a custom or optional door.

4” TOE KICK INSTALLATIONS

4” toe kick installations are possible using the supplied toe kick

or a custom built toe kick. Custom door panel height can be up

to 31-1/2” max. to align with adjacent cabinets.

Installation Custom Panel

6” TOE KICK INSTALLATIONS

6” toe kick installations are possible using a custom toe kick

only. Custom door panel height can be reduced to a min.

height of 28-3/8” to align with adjacent cabinets.

Advertising