JELD-WEN JII109 Interior Pre-Hung Doors User Manual

Installation instructions, For interior pre-hung doors (jii109), Important information & glossary

Advertising
background image

INSTALLATION INSTRUCTIONS

for Interior Pre-Hung Doors (JII109)

Read these installation instructions thoroughly before beginning. They
are designed to work in most existing applications. However, existing
conditions may require changes to these instructions. If changes are
needed, they are made at the installer’s risk. For installations other than
indicated in these instructions, contact a building professional.

Thank you for selecting JELD-WEN

®

products. Attached are JELD-WEN’s

recommended installation instructions for Interior Pre-Hung hollow
core, solid core, molded, and custom carved doors.

Not all door types may be installed into every wall condition in all
areas. Consult your local building code official for applicable building
codes and regulations. Local building code requirements supersede
recommended installation instructions. Failure to install into a square,
level and plumb condition could result in denial of warranty claims for
operational or performance problems.

Note to Installer:

Provide a copy of these instructions to the building

owner. By installing this product, you acknowledge the terms and
conditions of the limited warranty as part of the terms of the sale.

GLOSSARy

Head Jamb

The horizontal frame element at the top of the door

Pre-Hung Door

An assembly consisting of the door frame and door slab where the door
slab is already installed, or hung, in the frame.

Side Jambs

The vertical frame elements on either side of the door

ImPoRTAnT InFoRmATIon & GlossARy

Estimated Install

Time for New

Construction

First Time: 1½ hr

Experienced:

¾

hr

Professional:

½

hr

1

2

3

4

5

6

7

8

9

10

11 12

Slab

The operating part of the door assembly that swings open and closed
inside a frame

Please allow sufficient time to properly prepare the rough opening,
install the door, and ensure its proper operation.

SAFETy

• Read and fully understand ALL manufacturers’ instructions

before beginning.

• Do not work alone. Two or more people are required. Use safe lifting

techniques.

• Use caution when handling glass. Broken or cracked glass can cause

serious injury.

• Wear protective gear (e.g. safety glasses, gloves, ear protection, etc.).
• Operate hand/power tools safely and follow manufacturer’s

operating instructions.

sAFeTy & HAnDlInG

MATERIALS & DOOR HANDLING

• Make sure the slab is secured prior to installation.
• Heed material manufacturers’ handling and application instructions.
• Do not put stress on joints, corners or frames.
• Store door in dry, well-ventilated area in vertical, leaning position to

allow air circulation; do not stack horizontally or drag on the floor.

• Protect from exposure to direct sunlight during storage.
• Install only into vertical walls and when conditions are dry.

IF INJURy OCCURS, IMMEDIATELy SEEk MEDICAL ATTENTION!

Advertising