Installation – Yetter 2968 Fertilizer Combination Unit User Manual

Page 7

Advertising
background image

7

INSTALLATION

2968-006, 2968-016.

1. If the planter is already equipped with a unit mounted coulter and Residue

Manager Combination Unit the will have to be removed first to allow installation of
the new bracket onto the face plate of the planter.

2. The new Fertilizer Combination Bracket is assembled between the Deere coulter

bracket and the face plate of the planter with bolts from the Residue Manager
combination.

3. Attach the Residue Manager Combination Unit Arm to the Bracket and insert

Adjustment Pin to hold arm in place.

4. Attach a Fertilizer Combination Arm to the left side of the unit with ½” bolts and

locknuts. Attach a Fertilizer Combination Arm to the right side with ½” x 1-1/2”
bolts.

5. Assemble the Fertilizer Wheels and hubs. Place a 3/16” thick washer on ‘D’ bolt

and insert through the hub assembly and then assemble wheel cap with 5/16”
carriage bolts and locknuts.

6. Insert threaded end of ‘D’ bolt through ‘D’ hole in Fertilizer Combination Arm and

secure with 5/8 lock washer and nut. Torque 150 ft.lbs.

7. Assemble 3” stainless steel nipple, stainless steel coupler and nozzle tip (not

supplied). Slide this assembly into the Combo Nipple Holder and lock into position
with the 3/8” set-screw and jam nut.

8. Thread one ½” nut and Flat washer onto Combo Nipple Holder an insert the stud

through hole of Arm. Install another Flat washer and another ½” nut onto stud and
adjust the nozzle to be directly behind the Fertilizer Wheel. Tighten nuts securely.

9. Plumb your fertilizer lines to the attachment. Check that hoses do not become

pinched as the planter unit moves up and down.














Advertising