Installation – Yetter 2968 Fertilizer Combination Unit User Manual

Page 8

Advertising
background image

8

INSTALLATION

2968-007 AND 2968-008.

1. Attach the new Fertilizer Combination Bracket to the face plate of the planter with

the ½” x 1-1/2” bolts provided.

2. Attach a Fertilizer Combination Arm to each side of the unit with ½” bolts and

locknuts.

3. Assemble the Fertilizer Wheels and hubs. Place a 3/16” thick washer on ‘D’ bolt

and insert through the hub assembly and then assemble wheel cap with 5/16”
carriage bolts and locknuts.

4. Insert threaded end of ‘D’ bolt through ‘D’ hole in Fertilizer Combination Arm and

secure with 5/8 lock washer and nut. Torque 150 ft.lbs.

5. Assemble the Spoke Wheels and hubs as described in 2965, 2966, 2967.

Instruction Manual #2565-631.

6. Insert threaded end of ‘D’ bolt through ‘D’ hole in Fertilizer R.M. Stem and secure

with 5/8 lock washer and nut. Torque 150 ft.lbs.

7. Assemble 3” stainless steel nipple, stainless steel coupler and nozzle tip (not

supplied). Slide this assembly into the Combo Nipple Holder and lock into position
with the 3/8” set-screw and jam nut.

8. Thread one ½” nut and Flat washer onto Combo Nipple Holder an insert the stud

through hole of Arm. Install another Flat washer and another ½” nut onto stud and
adjust the nozzle to be directly behind the Fertilizer Wheel. Tighten nuts securely.

9. Attach Fert. R.M. Stem to the Fertilizer Combination Bracket using the Furrowing

Attachment Pin. Adjust.


10. Plumb your fertilizer lines to the attachment. Check that hoses do not become

pinched as the planter unit moves up and down.












Advertising