Functional test, Installation – Outback Power Systems GFX Series Inverter/Charger Installation Manual User Manual

Page 36

Advertising
background image

Installation

34

900-0113-01-00 Rev A

Functional Test

Once the mounting, wiring, and other installation steps are completed, proceed to the GFX Series
Operator’s Manual
. The Operator’s Manual has steps for powering up and performing a functional test
on the inverter system, as well as powering down and adding new devices to an existing system.

Refer to the system display manual for programming instructions and menus.

Advertising