Dake Model TB-16 User Manual

Page 10

Advertising
background image

9

7. OPERATION (PROCEDURE)

Drill / Chuck Installation:

To show greater detail

chuck guard is in the open position in POWER MUST BE OFF BEFORE
photos. CHUCK GUARD MUST IN MAKING ANY ADJUSTMENTS!
PLACE DURING OPERATION!

TURN POWER OFF!

Before inserting

drill bits, chucks or arbors, always
clean out spindle hole and taper hole
with a clean cloth.
Open chuck jaws completely by turning
attached chuck key counter-clockwise
until the jaws are fully opened.
To install the chuck to the arbor tightly,
slide the chuck into the taper forcing it
into the spindle with by hand. Place a
block of wood on the table then lower the
spindle to make contact with the wood
and press the chuck tightly into the
spindles taper.
Install a taper shaft drill bit into the taper
the same way as you would the chuck. If
an adaptor is used it must fit the taper
correctly and the bit must fit snug in the
adaptor.


Table lock

Table height adjustment:

Table height adjustment is
accomplished by loosening the clamp
bolt then adjusting the table with the
bracket handle to desired height. After
table is at working height, retighten
the clamp bolt securely.
Note: Keep table adjustment rack
clean from debris. Never attempt to
move table with clamp bolt tightened.

Advertising
This manual is related to the following products: