Dake Model G-75 User Manual

Page 4

Advertising
background image

5/20/2010

Model G-75

4

For phase converter connections please refer to the manufactures instructions.

1.3 Start Up:

To start the machine on the motor is the start switch. In order to start the machine the yellow

lock out door must be raised and the green start button pushed. (This prevents accidental start

up) The yellow door must remain open until you wish to stop the machine; this can be done by

either pushing the red button or pushing down on the door or E-stop button on the door.

(Figure 3) To lock the machine out simply snap the yellow door close until it latches and insert

lock out through the slot in the switch base.

1.4 Adjusting the machine for operation:

NOTE: Do not operate this machine until all adjustments have been made and you have

read the safety instructions!

Front tool / material rest must be adjusted approx. 1/16” (gap) from the contact wheel. Tool rest

must be tightened. (Figure 4)

Plexiglas eye shield must be set for the material you are grinding. This shield should be as

close to the material as possible without restricting grinding operation, approx. 1/8” – 1/4”

(Figure 4)

Spark catch box must be installed toward the back of the machine as far as it will go. (Figure 4)

1.5 Belt Installation / tracking:

NOTE: Turn off power and lock out whenever changing or installing grinding belt!

Always use high quality belts of the correct size!

Figure 3

Figure 4

Advertising