Install the canopy – LBL Lighting Chicago Jazz SCF User Manual

Page 3

Advertising
background image

3

Install the Canopy

4A

4"

Leave 6" of the cord behind the canopy for power
connections. Cut the excess cord.

From the end of the cord, strip the insulation 4" using a

sharp knife.

.

Strip the end of the wires.

Make sure not to nick the inner wires

7

1

7

2

7

3

4B

10

2

4

2

5

Feed the fixture wires through the crossbar center hole
and then pull them out of the electrical box.

Peel back or remove the cloth where the

secondary strain relief is installed.

Install the secondary strain relief by first feeding the
power cord through it.

Snap the strain relief tab into place.

Pull the cord to take up the slack and fit the rest of the
cord in the strain relief’s openings.

Note:

2

6

2

7

4C

10

2

8

2

9

2

10

4

5

6

7

7

TAB

11

10

Connect the red ballast wire to one of the insulated
pendant wires.

Connect the yellow ballast wire to the other insulated
pendant wire.

Connect the fixture and the crossbar ground wire to a
suitable ground in accordance with local electrical
codes.

Connect the white ballast wire to the neutral power line
wire.

Connect the black ballast wire to the hot power line
wire.

2

11

2

12

9

8

10

12

BALLAST

Advertising