LBL Lighting MO Chandelier Single Tier Round Surf Xfmr User Manual

Page 3

Advertising
background image

3

6

Slip the center of the transformer onto the crossbar nipple.

Secure the transformer to the ceiling by reattaching the inside

nut and washer to the crossbar nipple.

1D

INSIDE NUT

WASHER

12

Slip the stud in the transformer housing through the hole in

the dome cover marked with a silver dot.

Reattach the three screws to the side of the transformer to

secure the dome cover in place.

1E

10

9

8

13

1F

8

Connect the neutral power line wire to the white transformer

wire with a wire nut.

Connect the hot power line wire to the black transformer

wire with a wire nut.

Connect the fixture to a suitable ground according to local

electrical codes.

Feed the aircraft cable through the small holes in the dome

cover from the inside of the cover.

9

11

10

13

7

11

11

11

AIRCRAFT

CABLE

12

STUD

SCREW

7

6

Advertising
This manual is related to the following products: