1f 1d 1c – LBL Lighting Modular New York Medium/Large T5 with Emergency Backup for 227V User Manual

Page 2

Advertising
background image

2

Feed the switched, unswitched, and neutral/common power

line wires through the crossbar nipple.

Mount the crossbar assembly to the electrical box holes with

the two #8-32 screws provided.

Connect the crossbar to a suitable ground according to local

electrical codes.

CROSSBAR
ASSEMBLY

ELECTRICAL BOX HOLE

#8-32 SCREW

Place the housing on the crossbar nipple

Mark the location of the end holes in the housing onto the

wall and remove the housing.

NIPPLE

Install the anchors for the lag bolts at the points marked on

the wall.

Apply caulk around the anchor points and the electrical box.

ANCHOR

Mount the housing to the crossbar nipple with the nut and

lock washer provided.

Anchor the housing to the wall with lag bolts through the

metal and rubber washers provided.
Do not overtighten the lag bolts.

LAG BOLT

METAL WASHER

RUBBER WASHER

IMPORTANT: Make sure the test switch is at the
bottom when mounting the housing!

TEST SWITCH

1F

1D

1C

5

5

6

6

7

6

10

11

1E

8

9

11

12

13

9

8

9

13

12

13

11

10

Advertising