1f 1d – LBL Lighting Modular New York Medium/Large T8 User Manual

Page 2

Advertising
background image

1F

1D

2

Feed the power line wires through the crossbar nipple.

Mount the crossbar assembly to the electrical box holes with

the two #8-32 screws provided.

Connect the crossbar to a suitable ground according to local

electrical codes.

Install the anchors for the lag bolts at the points marked on

the wall.

Apply caulk around the anchor points and the electrical box.

ANCHOR

Mount the housing to the crossbar nipple with the nut and

lock washer provided.

Anchor the housing to the wall with lag bolts through the

metal and rubber washers provided.
Do not overtighten the lag bolts.

LAG BOLT

METAL WASHER

RUBBER WASHER

Place the housing on the crossbar nipple.

Mark the location of the end holes in the housing onto the

wall and remove the housing.

Feed the power line wires through the crossbar nipple.

Mount the crossbar assembly to the electrical box holes with

the two #8-32 screws provided.

Connect the crossbar to a suitable ground according to local

electrical codes.

CROSSBAR
ASSEMBLY

ELECTRICAL BOX HOLE

#8-32 SCREW

NIPPLE

1C

5

5

6

6

7

6

10

11

1E

8

9

11

12

13

9

8

9

13

12

13

11

10

Advertising