Install the fixture, 2d 2c 2b 2a – LBL Lighting Omni Small User Manual

Page 2

Advertising
background image

2D

2C

2B

2A

2

Install the anchor for the lag bolt at the point marked on the

wall.

For wet locations: Apply a thick bead of caulk around the

anchor point and the electrical box.

Mount the housing to the crossbar nipple with the nut and

lock washer provided.

Anchor the housing to the wall with a lag bolt through the

metal and rubber washers provided.
Do not overtighten the lag bolt.

LAG BOLT

METAL WASHER

RUBBER WASHER

Feed the power line wires through the nipple in the crossbar

and screw the crossbar to the electrical box.

Connect the crossbar to a suitable ground in accordance with

local electrical codes.

Place the housing on the crossbar nipple.

Mark the location of the end holes in the housing onto the

wall and remove the housing.

Install the Fixture

CROSSBAR

SCREW

POWER LINE WIRES

GROUND

ANCHOR

CAULK

1

2

3

4

5

6

7

8

4

3

5

6

7

8

Advertising
This manual is related to the following products: