Install the fixture, 2d 2c 2b – LBL Lighting Omni Medium User Manual

Page 2

Advertising
background image

2D

2C

2B

3

4

5

6

7

8

2

Install the anchor for the lag bolt at the point marked on the

wall.

For wet locations: Apply a thick bead of caulk around the

anchor point and the electrical box.

ANCHOR

CAULK

Mount the housing to the crossbar nipple with the nut and

lock washer provided.

Anchor the housing to the wall with lag bolts through the

metal and rubber washers provided.
Do not overtighten the lag bolts.

LAG BOLT

METAL WASHER

RUBBER WASHER

Place the housing on the crossbar nipple.

Mark the location of the end holes in the housing onto the

wall and remove the housing.

Install the Fixture

ANCHOR

2A

Feed the power line wires through the nipple in the crossbar

and screw the crossbar to the electrical box.

Connect the crossbar to a suitable ground in accordance with

local electrical codes.

CROSSBAR

SCREW

POWER LINE WIRES

GROUND

1

2

4

3

4

5

6

5

7

8

8

Advertising
This manual is related to the following products: